- The components of our VERO multidirectional scaffolding batches include:
- Adjustable actuators (0.60 m);
- Starting bases;
- Amounts (1.00 m);
- Amounts (2.00 m);
- Smooth (0.70 m);
- Smooth (2.5 m);
- Smooth (3.00 m);
- MDS Guardrail (0.70 m);
- MDS Guardrail (2.50 m);
- Steel trays ( 2.50/0.30 m);
- Steel trays (3.00/0.30 m);
- Trays with access hatch and integrated ladder (2.50 m x 0.60 m);
- These components may vary from batch to batch.
Technical specifications
- Part Type: VERO Multidirectional Scaffolding Lot.
- Surface: 155 m2
- Material: Galvanized Steel.
- Tube: 48.3 Ø.
- Min delivery time: 5 business days
- Max delivery time: 10 business days




