- The components of our multidirectional scaffolding batches include:
- Adjustable cylinders (0.70 m)
- Starting bases
- Amounts (1.00 m)
- Amounts (2.00 m)
- Smooth (0.75 m)
- Smooth (2.5 m)
- Smooth (3.00 m)
- MDS Guardrail (0.75 m)
- MDS Guardrail (2.50 m)
- Steel trays ( 2.50/0.33 m)
- Steel trays (3.00/0.33 m)
- Trays with access hatch and integrated ladder (2.50 m x 0.60 m)
- Steel skirting boards (0.75 m)
- Steel skirting boards ( 2.50 m)
- Steel skirting boards ( 3.00 m)
- These components may vary from batch to batch.
Technical specifications
- Type of part: Multidirectional scaffolding lot.
- Surface: 100 m2
- Material: Galvanized Steel.
- Tube: 48.3 Ø.
- Min delivery time: 5 business days
- Max delivery time: 10 business days




