On a construction site, safety must always come first. That is why mooring scaffolding is not a simple formality, but an essential step to prevent the risks of accident. Whether you are a site manager, an assembler or a craftsman, you must be familiar with the best practices for securely attaching scaffolding to its supporting structure.

Why do you need to tie up a scaffolding?

It is essential to understand that you need to tie up scaffolding in several specific situations. First of all, if the height of the scaffolding exceeds three times its base, mooring becomes mandatory to avoid tipping. Then, if the site is exposed to wind or if the ground is uneven or unstable, you must also provide a reliable anchoring system. In addition, at each modification of the structure (such as adding a floor, a change of direction or a junction between two modules), you must proceed with a new docking. Thus, you secure each level and ensure a balanced distribution of loads over the entire structure.

When do you need to tie up a scaffolding?

It is essential to understand that you need to tie up scaffolding in several specific situations. First of all, if the height of the scaffolding exceeds three times its base, mooring becomes mandatory to avoid tipping. Then, if the site is exposed to wind or if the ground is uneven or unstable, you must also provide a reliable anchoring system. In addition, at each modification of the structure (such as adding a floor, a change of direction or a junction between two modules), you must proceed with a new docking. Thus, you secure each level and ensure a balanced distribution of loads over the entire structure.

Which method to use depending on the type of wall?

Depending on the nature of the wall you are installing your structure on, the way to tie a scaffolding may vary. On a concrete wall, you can easily insert mechanical expansion dowels, which offer excellent resistance to tearing. However, be sure to respect a sufficient drilling depth (at least 7 to 10 cm) and to keep the anchors away from the edges of the wall.

In the case of a hollow brick or block wall, you must absolutely use chemical dowels with sieves. These devices increase the contact surface between the material and the resin, thus ensuring optimal hold despite the fragility of the support.

Finally, if you have to fix the scaffolding on a wooden frame or cladding, you must look for the load-bearing uprights of the structure and screw long wooden screws, accompanied by distribution plates. These precautions ensure the soundness of the installation without damaging the siding.

What errors to avoid when you want to tie up a scaffolding?

When starting or working in an emergency, it is common to make mistakes. However, poorly securing scaffolding can have serious consequences. Among the most common errors are the use of non-certified fasteners, irregular spacing between anchor points, or fastening in weak areas such as cracked walls or hollow joints.

Another common error is to overlook docking on the last levels. However, the top of the structure is precisely the area most exposed to wind and movement. It is therefore imperative to place complementary anchors there.

Why you always have to tie up a scaffolding with method

In summary, mooring scaffolding represents a technical, regulatory, and moral obligation. This simple but crucial gesture ensures the stability of your facilities and protects the stakeholders. By respecting the standards in force, choosing the right materials, and conducting regular checks, you ensure safe and professional working conditions.

Leave nothing to chance: a well-anchored scaffolding, it’s a secure site, serene staff, and assured productivity.